Not automatically. Suitability depends on the specific laser, extraction system, electrical equipment, area classification, atmosphere, and facility requirements. We conduct a site-specific review and provide job-specific safety documentation; work proceeds only when the equipment and plan are approved for the location.
FBE (fusion bonded epoxy), 3LPE, coal tar, asphalt, liquid epoxy, polyurethane, and zinc-rich primers. Multi-layer coating systems are removed in a single pass.